Location: Manhattan, New York
Gross floor area: 932 sft
Completion: December 2020
![20W-Cover](https://haute-architecture.com/wp-content/uploads/2023/09/20W-Cover.webp)
![20W-1](https://haute-architecture.com/wp-content/uploads/2023/09/20W-1.webp)
![20W-2](https://haute-architecture.com/wp-content/uploads/2023/09/20W-2.webp)
![20W-3](https://haute-architecture.com/wp-content/uploads/2023/09/20W-3.webp)
![20W-4](https://haute-architecture.com/wp-content/uploads/2023/09/20W-4.webp)
![20W-5](https://haute-architecture.com/wp-content/uploads/2023/09/20W-5.webp)
![20W-6](https://haute-architecture.com/wp-content/uploads/2023/09/20W-6.webp)
This project was the selective gut of a kitchen, walk-in-closet and two bathrooms in a two-bedroom apartment. The new kitchen and bathrooms are both timeless and warm.
Project Team
Architect of Record: Haute Architecture DPC
Contractor: Rush Hour Construction
Photography: Allyson Lubow Photography